East Link is Sound Transit’s voter-approved project to expand light rail from downtown Seattle to the Eastside with stations serving Mercer Island, south Bellevue, downtown Bellevue, Bel-Red, and Redmond’s Overlake area. East Link will connect to the Link light rail system between downtown Seattle and Sea-Tac Airport, currently under construction and scheduled to open in summer 2009. Sound Transit is also conducting environmental review on a future extension to downtown Redmond.
Documents in .pdf format require the free Adobe Reader to view.
Executive Summary, East Link Project Draft EIS
(.pdf, 9.6 mb)
East Link Project Draft EIS >>>
East Link Project Draft EIS Appendices
|
|
|
|
A-1 References |
|
|
A-2 List of Preparers |
|
|
A-3 List of Recipients |
|
|
A-4 Acronyms and Glossary |
|
|
|
|
|
|
|
|
|
|
|
|
|
F Technical Appendices |
|
|
|
|
|
|
|
|
|
|
|
F-4.6 Washington State Intersection Screening Tool (WASIST) Methodology and Results |
|
|
|
|
|
|
|
|
|
|
G East Link Maps and Drawings |
|
|
G-1 Conceptual Design Drawings |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
H Technical Background Reports |
|
|
|
|
|
|
|
|
|
|
|
H-4 Historical and Archaeological Resources Technical Report |
|
|
H-4 Historical and Archaeological Resources Technical Report App. A-B |
|
|
H-4 Historical and Archaeological Resources Technical Report App. C-D |
|










