Link light rail alert
Announcement Ongoing

Link Shuttle Buses are replacing the 1 Line from Saturday, February 1 to Sunday, February 2.

In effect: Jan. 10 - March 1

Routes: 1 Line
For several weekends in January and February, 1 Line service will be interrupted at some of the Downtown Seattle Transit Tunnel stations to allow for the completion of tie-in work that will connect the 1 Line and 2 Lines as well as work to repair overhead power at the UW Station. Link Shuttle Buses will provide service between stations during these service interruptions.

Jan. 10-12: Complete

Jan. 17-19: Complete

Feb. 1-2: Beginning the start of service shuttle buses will replace the 1 Line between U District and Capitol Hill stations, running every 10-15 minutes. Trains will operate between Lynnwood–U District every 12 minutes and Capitol Hill–Angle Lake every 15 minutes.

Passengers boarding at Roosevelt Station will experience a modified schedule. Please pay attention to in-station announcements, check train destination signs, or ask Sound Transit staff to ensure you're boarding the correct train. Thank you for your attention and cooperation

Affected Stops:

U District
-to Lynnwood: Take the 1 Line
- to Angle Lake: Brooklyn Ave NE & NE 45th St

Univ of Washington
- to Lynnwood: Montlake Blvd NE & NE Pacific St – Bay 2
- to Angle Lake: Montlake Blvd NE & NE Pacific Pl – Bay

Capitol Hill
- to Lynnwood: E John St & Broadway Ave E
- to Angle Lake: Take the 1 Line

Feb. 14-16: Beginning 10 p.m. on Feb. 14, shuttle buses will replace 1 Line service between Capitol Hill and SODO stations, running every 10-15 minutes. Trains will operate between Lynnwood–Capitol Hill and SODO–Angle Lake every 15 minutes. Trains will share one track at Shoreline South/148th Station.