In effect: March 31 - May 9
Routes: 2 Line
Passengers are required to exit trains at Redmond Technology Station to allow train operators to continue to the Downtown Redmond Station. Redmond Technology Station will continue to be the terminus station of the 2 Line until the extension to Downtown Redmond is completed and service officially begins around noon on May 10. During this time, station ETA’s may be unavailable. Trains will follow the scheduled arrival frequency of every 10 minutes.
Sound Transit will be testing trains with two cars to help validate the 2 Line system design.
Sound Transit will be testing trains with two cars to help validate the 2 Line system design.