Link light rail alert
Elevator closure Ongoing

South Bellevue Station expansion joint cover replacement project will take place from Monday, December 2 until Saturday, December 28. This work will take place from 7:00 AM until 5:00 PM daily.

In effect: Dec. 23-28

Routes: 2 Line
Beginning 7 a.m. Monday, December 2 through 5 p.m. Saturday, December 28, Sound Transit will be replacing expansion joint covers on the South Bellevue Station. This work entails closure of one elevator and stairwell at a time, beginning with the elevator and stairwell at the north end of the platform (Exit A). Once the expansion joints are replaced at the north end of the platform, the work will proceed to the south end of the platform (Exit B).

During the work hours, passengers should use the elevator or stairwell at the other end of the station. The work will occur from 7 a.m. to 5 p.m. each day. After 5 p.m. until 7 a.m. the following morning, the elevator and stairwell will be restored to service OR will remain closed.

Both elevators are stairwells are expected to be restored to service by 5 p.m. December 28.

For updates, passengers should subscribe to service alerts for accessibility. You can also sign up for station-specific updates. Visit the service alerts web page to sign up for alerts and current information on service disruptions. 

If you need assistance in a Sound Transit station, please call or text Security at (206) 398-5268. If you need specific trip planning support, please call Passenger Care at 1-888-889-6368 (Mon-Fri, 8 a.m.-6 p.m.).