Announcement
Ongoing
In effect: March 31 - May 9
Routes:
2 Line
Passengers will be required to exit trains at Redmond Technology Station to allow train operators to continue to the Downtown Redmond Station. Redmond Technology Station will continue to be the terminus station of the 2 Line until the 2 Line extension is completed later this year. During this time, station ETA’s may be unavailable. Trains will follow the scheduled arrival frequency of every 10 minutes.
Sound Transit will be testing trains with two cars to help validate the 2 Line system design.