Stops and stations
Use your current location, select a recent search, or start typing to search for routes, stops, or locations. Explore options with up and down arrows, or by touch. Select with enter, click, or tap.
Feedback

Wilburton Station

The south stairs and escalator will be inaccessible to passengers for the duration of the scaffolding removal. Passengers will need to use the south elevator or the north entrance.
Passengers are required to exit trains at Redmond Technology Station to allow train operators to continue to the Downtown Redmond Station. Redmond Technology Station will continue to be the terminus station of the 2 Line until the extension to Downtown Redmond is completed and service officially begins around noon on May 10. During this time, station ETA’s may be unavailable. Trains will follow the scheduled arrival frequency of every 10 minutes.

Sound Transit will be testing trains with two cars to help validate the 2 Line system design.