Shoreline South/148th Station
Connecting to new SR 522/NE 145th BRT.

News and updates

Rescheduled work: Alternating lane closure at NE 185th Street and 5th Ave overcrossing

This work has been rescheduled to Oct. 19th. Sound Transit will be alternating lane closure at Northeast 185th Street and 5th Avenue for pothole work.

Night time closure at NE 130th off-ramp from northbound I-5

As early as Sunday, Oct. 10th, Sound Transit will close the Northeast 130th Street off-ramp from northbound Interstate 5 for guideway construction.

Extended full closure at NE 145th overcrossing and NB I-5 NE 145th Street exit 175

This work will be extended to October 14th. Sound Transit will be closing the off-ramp from NB I-5 via exit 175 for work zone for girder setting. Additionally, there will be a full closure at the NE…

Extended full road closure on NE 125th Street from 5th Ave to 8th Ave for concrete panel

Sound Transit is extending this full closure at NE 125th Street from 5th Ave to 8th Ave for concrete panel pouring. The work will be extended to Saturday, October 9th.

Full closure at NE 145th overcrossing and NB I-5 NE 145th Street exit 175

As early as Wednesday, September 29th, Sound Transit will be closing the off-ramp from NB I-5 via exit 175 for work zone for girder setting. Additionally, there will be a full closure at the NE 145th…

Full road closure on NE 125th Street from 5th Ave to 8th Ave for concrete panel

Monday, September 27th, Sound Transit will begin the full closure at NE 125th Street from 5th Ave to 8th Ave for concrete panel pouring.

Northeast 145th On-Ramp to Northbound Interstate-5 Closure

Beginning Tuesday, September 28th, Sound Transit will be closing the on-ramp to NB I-5 from NE 145th Street. This closure is a necessary step for construction of the Lynnwood Link light rail.

Nightly full road closures of NE 175th Street

Starting Monday, September 20th, Sound Transit will be closing both directions of NE 175th Street from 5th Ave NE to the I-5 overpass. Additionally, both NE 175th Street to Northbound I-5 on &…

Night closures at 1st Ave NE between Northgate Way and NE 103rd Street; NE 107th ramp closures

As early as Monday, September 13th, Sound Transit will be closing lanes at 1st Ave NE between Northgate Way and NE 103rd Street. In addition, both NE 107th on-ramp and off-ramp will be closed at NE…

Night closure at NE 145th off-Ramp from Northbound Interstate-5 exit 175

Beginning Monday, September 13th, Sound Transit will be closing the off-ramp from NB I-5 via exit 175 for construction of the Lynnwood Link light rail.